WE DEVISED A SYSTEM OF TINY FLAGS (UNSEENABLE FROM ABOVE)
ON THE OUTER PERIMETER AND CENTER LINE OF EACH LETTER
USED 10'S OF THOUSANDS OF FLAGS.
TANDEM CREWS OF MANY LAND SURVEYORS, ENGINEERS, LEAD MEN AND FLAG HANDLERS
SPENT 10 DAYS STRAIGHT PLACING THESE FLAGS WITH USE OF LATEST GPS EQUIPMENT
ACCURATE TO A 1/4".
THROUGH BELOW FREEZING TEMPERATURES, WIND, RAIN AND HOT DESERT DAYS MY ART DEPARTMENT TEAM LED BY BRIAN JAMES AND RAY VANNATTA MADE SURE IT WAS PERFECT